Columbus Man-Tended Free Flyer (MTFF) payload operation planning/timelining and the corresponding logistics requirements; and telecommunication during the MTFF operational phase were studied. Critical areas for system development and operation are summarized.
Columbus MTFF (Man-Tended Free Flying) Utilieation, Phase B2x: Executive Summary for Main Study
1988
85 pages
Report
No indication
English