The Advisory Report summarizes the results of the Propulsion and Energetics Panel Working Group 15. The Group was in operation 1980-1987 and performed test runs of two J 57 turbojet engines at eight different facilities for ground-level and altitude test, in five different nations. At two facilities the test were repeated in order to review a possible deterioration of the engines. The test rig accompanied the engines to the test facilities. The tests were performed observing a carefully composed General Test Plan, being the same for all facilities. Each facility used its own data acquisition and processing system. Keywords: Jet and fast turbine engines; Propulsion and energetics panel; Propulsion systems; Jet propulsion. (JG)
Propulsion and Energetics Panel Working Group 15 on the Uniform Engine Test Programme
1990
146 pages
Report
No indication
English
Working Group Activities of AGARD Propulsion and Energetics Panel (93-GT-343)
Online Contents | 1994
|