This slide presentation reviews seven processes that NASA uses to ensure that software is developed, acquired and maintained as specified in the NPR 7150.2A requirement. The requirement is to ensure that all software be appraised for the Capability Maturity Model Integration (CMMI). The enumerated processes are: (7) Product Integration, (6) Configuration Management, (5) Verification, (4) Software Assurance, (3) Measurement and Analysis, (2) Requirements Management and (1) Planning & Monitoring. Each of these is described and the group(s) that are responsible is described.
Seven Processes that Enable NASA Software Engineering Technologies
2011
33 pages
Report
No indication
English
Technologies That Enable Today's Medical Breakthroughs
Online Contents | 2005
NASA Technologies that Benefit Society
NTRS | 2012
|NASA Software Engineering Benchmarking Study
NTIS | 2013
|