This slide presentation reviews seven processes that NASA uses to ensure that software is developed, acquired and maintained as specified in the NPR 7150.2A requirement. The requirement is to ensure that all software be appraised for the Capability Maturity Model Integration (CMMI). The enumerated processes are: (7) Product Integration, (6) Configuration Management, (5) Verification, (4) Software Assurance, (3) Measurement and Analysis, (2) Requirements Management and (1) Planning & Monitoring. Each of these is described and the group(s) that are responsible is described.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Seven Processes that Enable NASA Software Engineering Technologies


    Contributors:
    H. Housch (author) / S. Godfrey (author)

    Publication date :

    2011


    Size :

    33 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English