The report investigates the effect of ramp closure on the traffic operations of a freeway and an adjacent arterial street. Traffic operation on the freeway during peak hours experienced congestion due to the additional demand and poor geometric design of the Figueroa on-ramp. Closure of the ramp resulted in improvement in the traffic flow on the freeway without seriously affecting the operation of the arterial. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Harbor Freeway Ramp Closure


    Contributors:

    Publication date :

    1966


    Size :

    31 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English