On the basis of block diagrams and technical data sheets, the overall technical and scientific lay-out including the German Satellite Operation Network of this station is described. The overall system with its 14 subsystems is used for tracking, telemetering and telecommand of satellites. The antenna system of Z-DBS is designed to operate from a punched-tape-drive control unit on-line to a digital computer. Autotrack and conventional manual modes of operation are also provided for. (Author)
System Description of the Central Station of the German Ground Station Network. First Stage of CO,Pletion (Z-Dbs I) 1968-1970 . Rahmensystembeschreibung der Zentralstation des Deutschen Bodenstationssystems Erste Ausbaustufe (Z-Dbs I) 1968-1970
1971
163 pages
Report
No indication
English
Pdm-kommandokoder fuer die zentralstation des deutschen bodenstationssystems
Tema Archive | 1969
|Kompakt - Erste Ausbaustufe erreicht
Online Contents | 2013
Bundesbahn-Fotoalbum / Helmut Bittner ; Band 2: 1968-1970
GWLB - Gottfried Wilhelm Leibniz Bibliothek | 2020
|