The project begins within the city limits of Conrad, Montana, at the junction of FAS 534 and Virginia Street and extends westerly and northerly along FAS 534 for 1.65 miles to end west of Conrad at the Cemetery Road intersection. The first 0.9 miles will be built as a 2 lane curb and gutter urban facility that will provide 2-12 foot driving lanes, 2-12 foot parking lanes, a 1 foot painted median, and 5 foot sidewalks. The last 0.75 miles will use a 28 foot roadway with 2-12 foot driving lanes and 2 foot shoulders. The long lasting impact of this project will be beneficial in nature as it will provide a fast, safe, and efficient transportation facility. The main adverse impact from this project will be on the narrow band adjacent to the highway. In order to provide a highway of sufficient width, it will be necessary to remove about 90 ash and poplar trees in the existing right-of-way along the 4th Ave. South in Conrad.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Project S-434(1), Conrad-West (Urban Section), Montana


    Publication date :

    1973


    Size :

    19 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English