The project begins within the city limits of Conrad, Montana, at the junction of FAS 534 and Virginia Street and extends westerly and northerly along FAS 534 for 1.65 miles to end west of Conrad at the Cemetery Road intersection. The first 0.9 miles will be built as a 2 lane curb and gutter urban facility that will provide 2-12 foot driving lanes, 2-12 foot parking lanes, a 1 foot painted median, and 5 foot sidewalks. The last 0.75 miles will use a 28 foot roadway with 2-12 foot driving lanes and 2 foot shoulders. The long lasting impact of this project will be beneficial in nature as it will provide a fast, safe, and efficient transportation facility. The main adverse impact from this project will be on the narrow band adjacent to the highway. In order to provide a highway of sufficient width, it will be necessary to remove about 90 ash and poplar trees in the existing right-of-way along the 4th Ave. South in Conrad.
Project S-434(1), Conrad-West (Urban Section), Montana
1973
19 pages
Report
No indication
English