The Washington State Department of Transportation (WSDOT) designed and installed Service Level 1 (SL-1) bridge rails on three treated timber bridges in the state. To date there have been no accidents or maintenance problems reported at any of the modified bridges.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Traffic Barrier Systems Service Level 1 (SL-1) Bridge Rail


    Contributors:
    D. Gripne (author)

    Publication date :

    1987


    Size :

    41 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English





    High-Performance Aesthetic Bridge Rail and Median Barrier

    Lechtenberg, Karla A. / Bielenberg, Robert W. / Rosenbaugh, Scott K. et al. | Transportation Research Record | 2009


    High-Performance Aesthetic Bridge Rail and Median Barrier

    Lechtenberg, Karla A. | Online Contents | 2009


    Reduced-Height Performance Level 2 Bridge Rail

    Holloway, James C. | Online Contents | 1996


    Reduced-Height Performance Level 2 Bridge Rail

    Holloway, James C. / Sicking, Dean L. / Faller, Ronald K. | Transportation Research Record | 1996