Results are summarized herein of thirty-two test borings made at various locations within the area of the Glenmont Storage Yard in Section B012 of Glenmont Route. The exploration was performed to investigate subsurface conditions at the locations of the traction power substation, car wash, lead track, train control and yard operations buildings, yard trackage, retaining walls, storm management ponds and for earth work planning. The report contains geological sections, results of laboratory tests performed on samples recovered and a text describing design and construction problems.
Supplementary Subsurface Investigation, Glenmont Storage Yard, Section B012, Glenmont Route, July 14, 1993
1993
108 pages
Report
No indication
English
Tema Archive | 1995
|Subsurface investigation, section Loo1, L' enfant Plaza-Pentagon route
Tema Archive | 1974
|