This report shows that to achieve maximum aircraft utilization in airlift operations, optimal scheduling and staging can be formulated as a generalized network problem and solved using mixed-integer programming techniques. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Optimal Staging and Scheduling in Airlift Operations


    Contributors:
    S. W. Samn (author)

    Publication date :

    1981


    Size :

    16 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Aircraft and Crew Scheduling during Airlift Operations

    R. D. Armstrong / A. Charnes / S. Samn | NTIS | 1981


    History of Military Airlift Operations

    Owen, R. / AIAA / ICAS | British Library Conference Proceedings | 2003


    International Airlift Operations (Rapid Reaction Force)

    Burke, T. / AIAA / ICAS | British Library Conference Proceedings | 2003


    Temporal reasoning for airlift scheduling analysis

    Clay, J.D. / Wellman, M.P. / Bisbee, C.R. | Tema Archive | 1990


    Understanding Airfield Capability for Airlift Operations

    J. P. Stucker / R. T. Berg / A. A. Gerner et al. | NTIS | 1998