The proposed action is the construction of a road to provide better access to the flight line. The road will cross two branches of an unnamed stream that flows into Stoney Creek, a tributary of the Neuse River. The curbed road would be 28 wide and 2,700 feet in length. There would also be a 600 foot segment connecting the proposed road to an existing road. One stream crossing would use 48 reinforced concrete pipe with concrete headwalls and the other crossing would use dual 60 reinforced concrete pipe with concrete headwalls.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Environmental Assessment for Flight Line Access Road Seymour Johnson Air Force Base


    Contributors:
    L. Busch (author)

    Publication date :

    2009


    Size :

    23 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English