Since the Cullen Report into the accident at Ladbroke Grove, there has been increased pressure to improve the training of railway signallers. The Railway Engineering Company has responded to this situation by providing comprehensive signaller training systems. These have been installed for all workstations at all the IECC installations on Network Rail. More recently, simulators have also been provided for other types of control centre such as the MCS provided by GE Transportation Systems and the WestCAD system provided by Westinghouse Rail Systems. (16 pages)


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Operations - the value of training simulators [railway signaller training]


    Contributors:
    Ryland, H. (author)

    Publication date :

    2005-01-01


    Size :

    1 pages



    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Automation in Railway Operations: Effects on Signaller and Train Driver Workload

    Brandenburger, Niels/ N.G. / Thomas- Friedrich, Birte / Naumann, Anja et al. | German Aerospace Center (DLR) | 2018

    Free access

    Prediction of Signaller Workload

    Garner, T. / Newman, M. / Lowe, C. et al. | British Library Conference Proceedings | 2007


    A LIGHT SIGNALLER FOR AIRPORT STRUCTURES

    RAULI EMIDIO / SCARAMAGLI PIERO | European Patent Office | 2018

    Free access

    Validation of railway vehicle dynamic models in training simulators

    Öztürk, Veysi / Arar, Ömer Faruk / Rende, Ferhat Şükrü et al. | Taylor & Francis Verlag | 2017