The Solar Probe Plus (SPP) mission, part of NASA's Living With a Star program, is set to launch in July of 2018 on a trip to travel through the Sun's corona. The first component that will be integrated to the spacecraft is the Power Distribution Unit (PDU). The SPP PDU was based on the PDU design utilized for the Van Allen Probes (formerly Radiation Belt Storm Probes) mission, but with some very significant differences. Due to the fact that the SPP spacecraft is a much more complex vehicle, it requires nearly twice as many power services as the Van Allen mission which resulted in a PDU twice the size. Also, the Van Allen PDU utilized a single non-redundant Inter-Integrated Circuit (I2C) bus and command/telemetry interface (since the PDU redundancy was considered to be built into the dual spacecraft design) and the SPP PDU utilizes a dual redundant E2C bus along with 2 separate command and telemetry interfaces. Additionally, the command and telemetry Interface (I/F) paradigm between the PDU and the spacecraft was significantly modified. Although the Van Allen mission ultimately used L3 Telemetry West's In Control as their operational Telemetry and Command (T&C) Commercial off the Shelf (COTS) system, it was not ready for use during the original PDU development effort, so a legacy COTS system (EPOCH 2000) was utilized for Van Allen PDU testing. This required the conversion of the entire set of test scripts (tens of 1000's of lines) from one scripting language to another. These PDU design changes and test system changes presented a challenge to the test team since they were required to re-use the original Van Allen test systems as a cost savings measure. This paper will discuss the advantages of the re-use of the PDU test systems and how the test team overcame the various roadblocks, problems, and challenges that the team encountered in order to deliver the test sets along with the fully qualified PDU in a timely manner. The SPP PDU was successfully integrated to the spacecraft in August of 2016. It continues to operate as designed, providing power services for each and every component that has and will be added. The Integration and Test phase is set to be completed in the spring of 2017 after which the Solar Probe Plus spacecraft will be then readied for launch in July of 2018 from Cape Canaveral, Florida.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Spacecraft power distribution unit test system re-use: Advantages, pitfalls and challenges


    Contributors:
    Bucior, Sarah (author) / Segal, Lisa (author)


    Publication date :

    2017-03-01


    Size :

    418871 byte




    Type of media :

    Conference paper


    Type of material :

    Electronic Resource


    Language :

    English



    Challenges and Pitfalls

    Fantina, Robert / Storozhuk, Andriy / Goyal, Kamal | Springer Verlag | 2021


    FUNCTIONAL COMPARISONS AND ADVANTAGES OF INTEGRATED SPACECRAFT

    Simon, Xavier D. / Donahue, Ben B. / Duggan, Matthew B. | TIBKAT | 2021


    Functional Comparisons and Advantages of Integrated Spacecraft

    Simon, Xavier D. / Donahue, Ben B. / Duggan, Matthew B. | AIAA | 2021


    Monitoring system for spacecraft power distribution system

    ZHANG HANGFEI / JIA YANMEI / ZENG QILIN et al. | European Patent Office | 2024

    Free access

    Galileo spacecraft power management and distribution system

    Detwiler, R. C. / Smith, R. L. | NTRS | 1990