This contribution reports on results of high power tests of a remote steering launcher mock-up at 140 GHz with two integrated 90/spl deg/ mitre bends. Numerical modelling has been performed in order to optimize the input and output field pattern with respect to a reduced beam divergence.
High-power tests and analysis of a remote steering launcher mock-up for ECRH on ITER
2005-01-01
1740595 byte
Conference paper
Electronic Resource
English
WC5-38 High-Power Tests And Analysis Of A Remote Steering Launcher Mock-Up For ECRH On ITER
British Library Conference Proceedings | 2005
|