How can the railways be full if the lines are empty most of the time? That is the question the general public asks when railway companies say they cannot add additional services because the lines have reached maximum capacity; and it is a valid one.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    The next ETCS Level?


    Contributors:


    Publication date :

    2016-08-01


    Size :

    5554088 byte




    Type of media :

    Conference paper


    Type of material :

    Electronic Resource


    Language :

    English



    ETCS ETCS ETCS system with ETCS interface device

    KIM JINCHEOL | European Patent Office | 2023

    Free access

    ETCS: Switzerland takes the next step

    Green, Anitra | IuD Bahn | 2008


    ETCS Level 1 Limited Supervision-Migration von ETCS in die vorhandene Bahninfrastruktur

    Kirchner, Werner / Schölzel, Jürgen | Tema Archive | 2014


    ETCS

    Lestime, H. / International Union of Railway (UIC) | British Library Conference Proceedings | 1998


    ETCS

    Lestimé, H. | Online Contents | 1998