Under the Periodic Inspections Work Unit of the Monitoring Completed Coastal Projects Prograrn, base level condi- tions have been established for the above-water arrnor stone on the Bums Harbor North Breakwater. Tue positions of arrnor stone over the 1,414-m ( 4,640-ft) length of the breakwater have been defined through lirnited ground surveys, aerial photography, and photograrnrnetric analysis. Contour maps of the breakwater as weil as cross sections of the structure have been developed. In addition, a database of broken arrnor stones has been established. Tue site will be revisited periodically in the future and the long-term structural response of the breakwater to its environrnent will be tracked. Tue periodic data sets will be used to improve knowledge in design, construction, and maintenance of the ex- isting structure as weil as proposed future coastal projects.
Periodic Inspection of Burns Harbor North Breakwater, Indiana. Report 1, Base conditions
Technical Report ; CERC-96-8 rept.1
1996
15817405
Report
Electronic Resource
English
Reef Breakwater Wave-Attenuation and Stability Tests, Burns Waterway Harbor, Indiana
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1995
|Periodic Inspection of Nawiliwili Harbor Breakwater, Kauai, Hawaii. Report 1, Base conditions
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1996
|Periodic Inspection of Cleveland Harbor East Breakwater, Ohio. Report 1, Base Conditions
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1995
|Rubble-Mound Breakwater Wave-Attenuation and Stability Test, Burns Waterway Harbor, Indiana
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1993
|Reef Breakwater Design for Burns Waterway Habor, Indiana
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1995
|