The present invention relates to a method wherein a concrete structure for an anchor is fabricated so as to have a mooring cable penetration passage formed therein and to have a buoyancy chamber formed therein, a mooring cable is installed in the mooring cable penetration passage, the concrete structure for an anchor is transported to the installation point by using a tugboat while same is caused to float on the water surface by using the buoyancy chamber, the concrete structure for an anchor transported to the installation point is sunk underwater, and a filler material is injected into the buoyancy chamber such that the concrete structure for an anchor is seated on the seabed, and after the concrete structure for an anchor is seated on the seabed, both ends of the mooring cable are connected to a maritime floating structure which floats on the seawater surface or in seawater by means of buoyancy, thereby mooring the maritime floating structure. Accordingly, the force of coupling between the concrete structure for an anchor and the mooring cable is increased, and no underwater operation is necessary in connection with installation and replacement of the mooring cable.
La présente invention concerne un procédé dans lequel une structure en béton pour une ancre est fabriquée de façon à avoir un passage de pénétration de câble d'amarrage formé à l'intérieur de celle-ci et pour avoir une chambre de flottabilité formée à l'intérieur de celle-ci, un câble d'amarrage est installé dans le passage de pénétration de câble d'amarrage, la structure en béton pour une ancre est transportée vers le point d'installation à l'aide d'un remorqueur tandis que celle-ci est amenée à flotter sur la surface d'eau à l'aide de la chambre de flottabilité, la structure en béton pour une ancre transportée vers le point d'installation est immergée, et un matériau de remplissage est injecté dans la chambre de flottabilité de telle sorte que la structure en béton pour une ancre est posée sur le fond marin, et après que la structure en béton pour une ancre est posée sur le fond marin, les deux extrémités du câble d'amarrage sont reliées à une structure flottante maritime qui flotte sur la surface d'eau de mer ou dans l'eau de mer au moyen d'une flottabilité, ce qui permet d'amarrer la structure flottante maritime. Par conséquent, la force de couplage entre la structure en béton pour une ancre et le câble d'amarrage est augmentée, et aucune opération sous-marine n'est nécessaire en liaison avec l'installation et le remplacement du câble d'amarrage.
본 발명은 계류줄 관통 통로가 내부에 형성되며 부력실이 형성된 앵커용 콘크리트 구조물을 제작하고, 상기 계류줄 관통 통로에 계류줄을 설치하며, 상기 부력실을 이용하여 상기 앵커용 콘크리트 구조물을 수면에 부유시킨 상태로 예인선을 이용하여 설치 지점으로 운반하며, 상기 설치 지점으로 운반된 앵커용 콘크리트 구조물을 수중에 가라앉히고 상기 부력실에 속채움재를 투입하여 상기 앵커용 콘크리트 구조물을 해저면에 안착시키며, 상기 앵커용 콘크리트 구조물이 해저면에 안착된 후 상기 계류줄의 양단을 부력에 의하여 해수면 또는 해수중에 부유하는 해양 부유 구조물에 연결하여 상기 해양 부유 구조물을 계류시키는 방법에 관한 것으로, 이에 의하여 앵커용 콘크리트 구조물과 계류줄의 결합력을 높일 수 있으며, 또한 계류줄의 설치 및 교체와 관련하여 수중 작업이 불필요하게 된다.
MARITIME FLOATING STRUCTURE MOORING METHOD AND METHOD FOR REPLACING MOORING CABLE OF MARITIME FLOATING STRUCTURE MOORING SYSTEM
PROCÉDÉ D'AMARRAGE DE STRUCTURE FLOTTANTE MARITIME ET PROCÉDÉ DE REMPLACEMENT D'UN CÂBLE D'AMARRAGE D'UN SYSTÈME D'AMARRAGE DE STRUCTURE FLOTTANTE MARITIME
해양 부유 구조물 계류 방법 및 해양 부유 구조물 계류 시스템의 계류줄 교체 방법
2024-08-29
Patent
Electronic Resource
Korean
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |
Floating system mooring structure, system and mooring method
European Patent Office | 2024
|