A climbing system for a tower crane, and a tower crane. The climbing system for a tower crane comprises a climbing frame (1) and an electric cabinet (100); the electric cabinet (100) is arranged on the climbing frame (1) and is used for being communicationally connected to a control device in a driver's cab of the tower crane, so that the tower crane can be controlled to work; therefore, the control of the tower crane can be moved down to the electric cabinet (100) of the climbing frame (1), so that by operating the electric cabinet (100) on the climbing frame (1), an operator on a platform of the climbing frame (1) can control the tower crane to work, thereby omitting the operation of a tower crane driver, reducing manpower during tower crane mast addition/reduction, and achieving the purposes of improving the operation efficiency of tower crane mast addition/reduction and reducing the high-altitude operation risk and the labor intensity.

    L'invention concerne un système de hissage destiné à une grue à tour, et une grue à tour. Le système de hissage destiné à une grue à tour comprend un cadre de hissage (1) et une armoire électrique (100) ; l'armoire électrique (100) est disposée sur le cadre de hissage (1) et est utilisée pour être connectée en communication à un dispositif de commande dans une cabine d'opérateur de la grue à tour, de telle sorte que la grue à tour peut être commandée pour fonctionner ; par conséquent, la commande de la grue à tour peut être déplacée vers le bas jusqu'à l'armoire électrique (100) du cadre de hissage (1), de telle sorte que, en actionnant l'armoire électrique (100) sur le cadre de hissage (1), un opérateur sur une plateforme du cadre de hissage (1) peut commander le fonctionnement de la grue à tour, ce qui permet d'omettre l'actionnement d'un opérateur de grue à tour, de réduire la main-d'œuvre pendant l'ajout/la réduction du mât de grue à tour, et d'atteindre des objectifs d'amélioration de l'efficacité d'actionnement de l'ajout/la réduction de mât de grue à tour et de réduire du risque d'actionnement à haute altitude et de l'intensité de main-d'œuvre.

    一种用于塔机的爬升系统及塔机,用于塔机的爬升系统包括爬升架(1)和电控箱(100),电控箱(100)设置在爬升架(1)上并用于与塔机的司机室内的控制装置通讯连接,以能够控制塔机工作,则可以将塔机的控制权下移至爬升架(1)的电控箱(100)上,使得在爬升架(1)平台上的操作人员通过操作爬升架(1)上的电控箱(100)就可以控制塔机进行工作,从而省去了塔机司机的操作,实现了塔机加节/减节作业时的少人化,达到了提升塔机加节/减节作业效率、降低高空作业风险和劳动强度的目的。


    Access

    Download


    Export, share and cite



    Title :

    CLIMBING SYSTEM FOR TOWER CRANE, AND TOWER CRANE


    Additional title:

    SYSTÈME DE HISSAGE POUR GRUE À TOUR ET GRUE À TOUR
    用于塔机的爬升系统及塔机


    Contributors:
    LAN JIABIAO (author) / FU YINGXIONG (author) / LIU SHENGPING (author) / KONG BOQUN (author) / YAO HUAHUI (author)

    Publication date :

    2024-04-04


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    B66C Krane , CRANES



    Climbing system for tower crane and tower crane

    LAN JIABIAO / LIU SHENGPING / FU YINGXIONG et al. | European Patent Office | 2022

    Free access

    CLIMBING SYSTEM FOR TOWER CRANE AND TOWER CRANE

    LAN JIABIAO / LIU SHENGPING / FU YINGXIONG et al. | European Patent Office | 2023

    Free access

    Climbing system for tower crane and tower crane

    LAN JIABIAO / FU YINGXIONG / LIU SHENGPING et al. | European Patent Office | 2023

    Free access

    Climbing device for tower crane and tower crane

    LAN JIABIAO / LIU SHENGPING / FU YINGXIONG et al. | European Patent Office | 2023

    Free access

    CLIMBING DEVICE FOR TOWER CRANE, AND TOWER CRANE

    LAN JIABIAO / LIU SHENGPING / FU YINGXIONG et al. | European Patent Office | 2024

    Free access