A CTC3.0-based automatic generation and execution method for a detachment and attachment plan of a lead locomotive. According to the method, a station traffic indication board terminal and a data platform function in a CTC3.0 system are upgraded, such that the automatic generation of the detachment and attachment plan of the lead locomotive is triggered when the station traffic indication board terminal receives a train plan, and the detachment and attachment operation of the lead locomotive is completed. The present invention has the advantages of high automation degree, high transportation efficiency, and the like.

    Procédé de génération et d'exécution automatiques basées sur CTC3.0 pour un plan de détachement et de fixation d'une locomotive menante. Selon le procédé, un terminal de carte d'indication de circulation de gare et une fonction de plateforme de données dans un système CTC3.0 sont mis à niveau, de telle sorte que la génération automatique du plan de détachement et de fixation de la locomotive menante est déclenchée lorsque le terminal de carte d'indication de circulation de gare reçoit un plan de train, et l'opération de détachement et de fixation de la locomotive menante est achevée. La présente invention présente les avantages d'un degré d'automatisation élevé, d'une efficacité de transport élevée et analogues.

    一种基于CTC3.0的本务机摘挂计划自动生成与执行方法,方法通过升级CTC3.0系统中的占线板终端及数据平台功能,使得占线板终端在接收到列车计划时触发本务机摘挂计划的自动生成,从而完成本务机摘挂作业。具有自动化程度高、运输效率高等优点。


    Access

    Download


    Export, share and cite



    Title :

    CTC3.0-BASED AUTOMATIC GENERATION AND EXECUTION METHOD FOR DETACHMENT AND ATTACHMENT PLAN OF LEAD LOCOMOTIVE


    Additional title:

    PROCÉDÉ DE GÉNÉRATION ET D'EXÉCUTION AUTOMATIQUES BASÉES SUR CTC3.0 POUR UN PLAN DE DÉTACHEMENT ET DE FIXATION D'UNE LOCOMOTIVE MENANTE
    一种基于CTC3.0的本务机摘挂计划自动生成与执行方法


    Contributors:
    CHEN XUAN (author) / LI HUARONG (author) / WANG JIANNIAN (author) / LU YINGTAO (author) / CHEN ZHENJIE (author) / CHEN DEJUN (author) / YOU ZHENG (author) / ZHAO YANGJIE (author)

    Publication date :

    2023-02-16


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC



    CTC3.0-BASED AUTOMATIC GENERATION AND EXECUTION METHOD FOR DETACHMENT AND ATTACHMENT PLAN OF LEAD LOCOMOTIVE

    CHEN XUAN / LI HUARONG / WANG JIANNIAN et al. | European Patent Office | 2024

    Free access

    CTC3.0-BASED LOCOMOTIVE DECOUPLING AND COUPLING PLAN AUTOMATIC GENERATION AND EXECUTION METHOD

    CHEN XUAN / LI HUARONG / WANG JIANNIAN et al. | European Patent Office | 2024

    Free access

    Method for analyzing peak pushing access of CTC3.0 system

    WU GUANGWEN / WU CHUNBO / QIN YANFENG et al. | European Patent Office | 2023

    Free access

    CONNECTION PIN ATTACHMENT/DETACHMENT JIG AND ATTACHMENT/DETACHMENT METHOD THEREOF

    MIYAZAKI KAZUYUKI | European Patent Office | 2020

    Free access

    CTC3.0-based implementation method for route handling of regional centralized control station

    CHEN XUAN / WANG XINGLI / LI HUARONG et al. | European Patent Office | 2024

    Free access