The present invention relates to an assembly for installing a pile (2) in a seabed (3), the assembly comprising a vessel (23) comprising a positioning system for keeping the vessel (23) at an installation location relative to the seabed, the positioning system (5) having a positioning stiffness (7); a pile guiding system configured to guide the pile (2) during installation thereof, the pile guiding system comprising a base (9) provided on the vessel; a first guiding device connected to the base, the first guiding device being configured to accommodate the pile during installation thereof; a resilient member (11) for providing a resilient connection between the vessel (23) and the pile during installation thereof for allowing relative motions between the pile (2) and the vessel (23), the resilient member having a connection stiffness, wherein the resilient member (11) is configured and intended to keep a natural period of a pivoting movement of the pile about the seabed caused by waves during installation thereof longer than a dominant wave period of a wave spectrum at the installation location by providing the resilient connection with a low connection stiffness.

    La présente invention concerne un ensemble pour installer un pieu dans un fond marin, l'ensemble comprenant un navire comprenant un système de positionnement pour maintenir le navire au niveau d'un emplacement d'installation par rapport au fond marin, le système de positionnement présentant une rigidité de positionnement ; un système de guidage de pieu conçu pour guider le pieu pendant son installation, le système de guidage de pieu comprenant une base disposée sur le navire ; un premier dispositif de guidage relié à la base, le premier dispositif de guidage étant conçu pour recevoir le pieu pendant son installation ; un élément élastique pour fournir une liaison élastique entre le navire et le pieu pendant son installation pour permettre des mouvements relatifs entre le pieu et le navire, l'élément élastique présentant une rigidité de liaison, l'élément élastique étant conçu et destiné à maintenir une période naturelle d'un mouvement de pivotement du pieu autour du fond marin provoquée par les vagues pendant son installation plus longue qu'une période de vagues dominantes d'un spectre de vagues au niveau de l'emplacement d'installation en fournissant la liaison élastique avec une faible rigidité de liaison.


    Access

    Download


    Export, share and cite



    Title :

    ASSEMBLY AND METHOD FOR INSTALLING A PILE INTO A SEABED


    Additional title:

    ENSEMBLE ET PROCÉDÉ D'INSTALLATION D'UN PIEU DANS UN FOND MARIN


    Contributors:

    Publication date :

    2021-09-02


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    English


    Classification :

    IPC:    B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS / B66C Krane , CRANES / E02D FOUNDATIONS , Gründungen / F16L PIPES , Rohre



    ASSEMBLY AND METHOD FOR INSTALLING A PILE INTO A SEABED

    MESKERS GERARDUS PETRUS | European Patent Office | 2022

    Free access

    Assembly and method for installing a pile into a seabed

    MESKERS GERARDUS PETRUS | European Patent Office | 2022

    Free access

    ASSEMBLY AND METHOD FOR INSTALLING A PILE INTO A SEABED

    MESKERS GERARDUS PETRUS | European Patent Office | 2023

    Free access

    Devices and methods for installing piles into the ground or seabed

    HUISMAN MARCO / OTTOLINI MARIUS GABRIËL / GEENE PAUL et al. | European Patent Office | 2022

    Free access

    Tool assembly for installing a suction pile

    MOHRFELD AUSTIN T | European Patent Office | 2018

    Free access