The intervention platform comprises: a floating base, immersed in a body of water; at least a wind turbine equipment lifting tower, configured to lift at least an equipment of the wind turbine; The intervention platform has at least a heave plate configured to protrude laterally from the floating base, the heave plate defining an upper surface configured to engage a lower surface of the offshore wind turbine platform. The floating base has at least a ballast receiving volume, the intervention platform having a ballast controller configured to control a quantity of ballast received in the ballast receiving volume to lift the upper surface of the offshore heave plate in contact with the lower surface of the offshore wind turbine platform.
OFFSHORE FLOATING INTERVENTION PLATFORM INTENDED TO DOCK ON AN OFFSHORE WIND TURBINE PLATFORM, RELATED ASSEMBLY AND INTERVENTION METHOD
2025-07-03
Patent
Electronic Resource
English
European Patent Office | 2023
|European Patent Office | 2024
|European Patent Office | 2023
|European Patent Office | 2024
|European Patent Office | 2024
|