A system transports a load along a transport route, wherein the load is hoisted and kept suspended along the route. The system includes a bridge, a hoisting module hanging down from the bridge, a haul mechanism, and a resource optimizer for determining an optimal-resource consumption route, including determining respective parameters of acceleration, deceleration, and sway-restraint maneuvers. The route is segmented, wherein a respective segment safe-travel sway-span and a respective segment hand-over sway-span are predetermined. Each segment includes an initial acceleration section and a final deceleration section. The resource optimizer determines segment minimum resource consumption routes including determining respective parameters of acceleration, deceleration, and sway-restraint maneuvers, per the segment safe-travel sway-span and the segment hand-over sway-span, and combines possible minimum resource consumption routes, for selecting therefrom an optimal resource consuming route out of the possible minimum resource consuming routes. Transporting of the load is conducted pursuant to the optimal resource consumption route.
SYSTEM AND METHOD FOR TRANSPORTING A SWAYING HOISTED LOAD
2021-07-08
Patent
Electronic Resource
English
IPC: | B66C Krane , CRANES |
SYSTEM AND METHOD FOR TRANSPORTING A SWAYING HOISTED LOAD
European Patent Office | 2022
|System and method for transporting a swaying hoisted load
European Patent Office | 2024
|SYSTEM AND METHOD FOR TRANSPORTING A SWAYING HOISTED LOAD
European Patent Office | 2020
|European Patent Office | 2021
|