A support installation includes support members for supporting an electric cable, a tower crane, a mast and a jib linked to an upper portion of the mast. The jib and the mast respectively extend according to a jib direction and a substantially vertical mast direction. The support members are secured to the jib and disposed at a plurality of locations distant according to the jib direction. The support members extend transversally to the jib direction to protrude laterally from the jib. The jib is cantilevered when the support installation is in the service configuration.
INSTALLATION AND SUPPORT METHOD INCLUDING A TOWER CRANE FOR SUPPORTING A HIGH-VOLTAGE LINE ELECTRIC CABLE
2018-01-04
Patent
Electronic Resource
English
IPC: | B66C Krane , CRANES / B66F HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD , Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last / H04B TRANSMISSION , Übertragung |
European Patent Office | 2019
|Multifunctional tower crane for electric power installation
European Patent Office | 2020
|Installation method of adjustable tower crane pre-embedded fixed supporting leg
European Patent Office | 2024
|