A method for route handling of a regional centralized control station is based on a CTC3.0 technology, and includes the following steps: step (1): generating multi-station train and shunting plans according to a multi-station planning terminal, and executing steps (2) and (4) at the same time; step (2): sending the train plan to an autonomous computer to generate a train route sequence, and executing step (3); step (3): sending, by the autonomous computer, the train route sequence to a regional centralized control route handling terminal; step (4): compiling, by the multi-station planning terminal, an automatically generated shunting route sequence in the shunting plan, and executing step (5); and step (5): synchronizing, by a center service, the shunting route sequence to the regional centralized control route handling terminal.
CTC3.0-based implementation method for route handling of regional centralized control station
2024-04-09
Patent
Electronic Resource
English
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
CTC3.0-BASED IMPLEMENTATION METHOD FOR ROUTE HANDLING OF REGIONAL CENTRALIZED CONTROL STATION
European Patent Office | 2022
|CTC 3.0-BASED IMPLEMENTATION METHOD FOR REGIONAL CENTRALIZED CONTROL STATION ROUTE HANDLING
European Patent Office | 2021
|Method for analyzing peak pushing access of CTC3.0 system
European Patent Office | 2023
|European Patent Office | 2023
|Shunting route monitoring method for non-centralized area
European Patent Office | 2020
|