A method for producing a concrete tube for a hyperloop passenger transport system. The concrete tube is concreted in situ by means of a formwork device. The formwork device has a formwork carriage which moves forwards during concreting. The formwork carriage has an inner form and an outer form for shuttering the concrete tube. An interspace between the inner form and outer form is filled, in particular continuously, with concrete. The solidified concrete tube can be supported on pillars via bearings. The freshly solidified portion of the concrete tube is preferably supported on the inside by inner rollers and on the outside by outer rollers. In order to support the formwork carriage on the pillars, the formwork device can have supporting rollers. The formwork device for implementing the method and to the concrete tube produced by the method for the hyperloop passenger transport system.
Concrete tube and formwork device and method for producing such a concrete tube
2024-03-26
Patent
Electronic Resource
English
IPC: | B61B RAILWAY SYSTEMS , Eisenbahnanlagen / E04G SCAFFOLDING , Baugerüste / B28B Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel , SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER |
CONCRETE TUBE AND FORMWORK DEVICE AND METHOD FOR PRODUCING SUCH A CONCRETE TUBE
European Patent Office | 2021
|Concrete formwork hoisting method and connecting clamp used in concrete formwork hoisting method
European Patent Office | 2015
|Concrete tunnel immersed tube joint transportation method
European Patent Office | 2023
|Auxiliary device and construction method for erecting concrete pouring formwork
European Patent Office | 2021
|