A train operation control system includes: a headcount estimation device that estimates the number of people in a train and the number of people on a platform by using video data outputted from a plurality of on-board cameras and a plurality of ground cameras; and a train rescheduling device that predicts a dwell time required for passengers to board and detrain from the train using the estimated headcount information estimated by the headcount estimation device and schedule information stored in an operation management device, and accordingly performs train operation rescheduling. The train operation control system can predict the dwell time accurately and accordingly perform train operation rescheduling even when the number of passengers fluctuates.
Train operation control system and train operation control method
2021-03-23
Patent
Electronic Resource
English
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC / G06Q Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke , DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES / G08G Anlagen zur Steuerung, Regelung oder Überwachung des Verkehrs , TRAFFIC CONTROL SYSTEMS |
TRAIN OPERATION CONTROL SYSTEM AND TRAIN OPERATION CONTROL METHOD
European Patent Office | 2019
|TRAIN OPERATION CONTROL SYSTEM AND TRAIN OPERATION CONTROL METHOD
European Patent Office | 2019
|TRAIN OPERATION CONTROL SYSTEM, ON-TRAIN DEVICE, AND TRAIN OPERATION CONTROL METHOD
European Patent Office | 2015
|European Patent Office | 2020
|European Patent Office | 2023
|