A method for building a bridge, said bridge comprising piers and at least one deck. The method including a cantilever step, wherein a girder is set in a cantilevered position relative to a bank or to a constructed zone of the bridge so that the girder comprises a first end overhanging the bank or the constructed zone, and a second end overhanging a construction zone of the bridge, and a construction step, wherein pier elements and deck elements are installed in said construction zone via a first and a second lifting devices mounted movable on the girder between the first and second ends. The first and second lifting devices cross one another along the girder during the cantilever step and/or during the construction step.


    Access

    Download


    Export, share and cite



    Title :

    Method for building a bridge and bridge-building apparatus


    Contributors:

    Publication date :

    2018-06-26


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    English


    Classification :

    IPC:    E01D BRIDGES , Brücken / B66C Krane , CRANES



    METHOD FOR BUILDING A BRIDGE AND BRIDGE-BUILDING APPARATUS

    BERMINGHAM PATRICK D / MELLIER ERIK / GABALDO STEFANO L et al. | European Patent Office | 2017

    Free access


    Bridge & Building: Building on past gains

    Bradley, M. / Lileikis, J. | British Library Online Contents | 1996


    Bridge and building section

    Engineering Index Backfile | 1943


    Bridge and building section

    Engineering Index Backfile | 1947