An integrated construction and installation method for an upper part processing module of a floating production facility, the integrated construction and installation method being carried out in an intelligent site formed by integrating an offshore engineering module manufacturing plant and a shipyard, and mainly comprising the following steps: step S1, completing the construction of the upper part processing module of the floating production facility so as to form an entire communal facility module and a production processing module; step S2, transporting the entire upper part processing module of the floating production facility to a general group area for overall installation; step S3, employing a jacking system and a slip system to mount the manufactured communal facility module and the production processing module onto a hull; and step S4, conducting overall commissioning. The integrated construction and installation method for the upper part processing module of a floating production facility may greatly shorten the work cycle, reduce overall construction costs, reduce hoisting work and aerial work, and reduce construction risks.


    Access

    Download


    Export, share and cite



    Title :

    Способ интегрированного строительства и монтажа оборудования для верхнего технологического блока плавучего основания


    Publication date :

    2019-07-19


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Russian


    Classification :

    IPC:    B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS