Provided are a system to plan a yarn crane work and a method thereof. Provided are the system to plan a yarn crane work and the method thereof. The system includes: a scenario providing part providing a plurality of work scenarios; a first evolving part evolving a first value group including a plurality of first candidate values by using a genetic algorithm; and a second evolving part evolving a second value group including a plurality of second candidate values by using the genetic algorithm. The first evolving part evaluates each of the first candidate values based on a second strategy which is the best candidate value of the second value group. The second evolving part evaluates each of the second candidate values based on a first strategy which is the best candidate value of the first value group. Evaluating each of the first and second candidate values is based on each work scenario randomly selected from among the work scenarios.
장치장 크레인 작업 계획 시스템 및 방법이 제공된다. 장치장 크레인 작업 계획 시스템은, 복수의 작업 시나리오를 제공하는 시나리오 제공부, 유전자 알고리즘을 이용하여 복수의 제1 후보해를 포함하는 제1 해집단을 진화시키는 제1 진화부, 및 유전자 알고리즘을 이용하여 복수의 제2 후보해를 포함하는 제2 해집단을 진화시키는 제2 진화부를 포함하고, 제1 진화부는, 제2 해집단의 가장 우수한 후보해인 제2 전략에 기반하여 각각의 제1 후보해를 평가하고, 제2 진화부는, 제1 해집단의 가장 우수한 후보해인 제1 전략에 기반하여 각각의 제2 후보해를 평가하고, 각각의 제1 및 제2 후보해를 평가하는 것은, 복수의 작업 시나리오로부터 임의로 선택되는 작업 시나리오에 각각 기반한다.
SYSTEM AND METHOD FOR PLANNING YARD CRANE JOBS
장치장 크레인 작업 계획 시스템 및 방법
2018-07-05
Patent
Electronic Resource
Korean
IPC: | G06Q Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke , DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES / B66C Krane , CRANES |
Yard crane long-range control system and yard crane long-range control method
European Patent Office | 2016
|