The present invention relates to a climbing crane apparatus which makes the construction of pylons, such as transmission towers, easier. According to the present invention, the climbing crane apparatus comprises: a crane part (100) operating to lift and move a heavy object; a mast part (200) supporting the crane part (100) and composed of a plurality of masts stacked in a vertical direction; a plurality of guide modules (300) arranged to be spaced apart from each other in a longitudinal direction of the mast part (200) to prevent buckling of the mast part (200); and a winch module (400) enabling the mast part (200) to move up and down step by step in a state of being fixedly disposed on a pylon (500). Each of the guide modules (300) is inserted in such a manner as to be covered by the mast part (200) to prevent buckling of the mast part (200) and fixed to the pylon (500) through drawn wires. During a step-by-step process of constructing the pylon (500) through the step-by-step rise and fall of the mast part (200), a guide module at a lower side among the guide modules (300) performs a function of supporting the mast part (200) while being combined to an upper side of the pylon (500) after being separated.

    본 발명에 따른 클라이밍 크레인 장치는 중량물의 인양과 이송 작업을 위한 기능을 하는 크레인부(100); 상기 크레인부(100)를 지지하며, 상하 방향으로 복수개의 마스트를 적층하여 이루어진 마스트부(200); 상기 마스트부(200)의 길이 방향을 따라 복수개가 이격 배치되어 상기 마스트부(200)의 좌굴을 방지하기 위한 복수의 가이드 모듈(300); 및 철탑(500) 상에 고정 배치된 상태에서 상기 마스트부(200)의 단계적인 승강을 가능하게 하는 윈치 모듈(400);을 포함하고, 상기 복수의 가이드 모듈(300) 각각은 상기 마스트부(200)의 좌굴을 방지하기 위하여 상기 마스트부(200)에 씌워지는 방식으로 삽입하고, 인출된 와이어를 통해 철탑(500)과 고정되며, 상기 마스트부(200)의 단계적인 승강을 통해 상기 철탑(500)을 단계적으로 시공하는 과정 중에, 상기 복수의 가이드 모듈(300) 중 하부 측의 가이드 모듈은 분리 후에 상기 철탑(500)의 상부 측에 결합된 상태에서 상기 마스트부(200)를 지지하는 기능을 수행한다.


    Access

    Download


    Export, share and cite



    Title :

    Climbing crane apparatus for transmission tower construction


    Additional title:

    송전탑 시공을 위한 클라이밍 크레인 장치


    Contributors:
    HAN AE LEE (author) / PARK GUN JEONG (author) / CHOI GUN SOO (author)

    Publication date :

    2020-01-30


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Korean


    Classification :

    IPC:    B66C Krane , CRANES / B66D Haspeln , CAPSTANS



    CLIMBING CONSTRUCTION METHOD OF TOWER CRANE

    NAGATA KOHEI / SAKURAI TOYOKI / TAKEUCHI SEIICHI et al. | European Patent Office | 2019

    Free access

    CLIMBING SYSTEM FOR TOWER CRANE AND TOWER CRANE

    LAN JIABIAO / LIU SHENGPING / FU YINGXIONG et al. | European Patent Office | 2023

    Free access

    Tower crane, climbing frame of tower crane and climbing frame installing method

    ZHAO WEIJUAN / YU LIHU | European Patent Office | 2020

    Free access

    Climbing system for tower crane and tower crane

    LAN JIABIAO / LIU SHENGPING / FU YINGXIONG et al. | European Patent Office | 2022

    Free access

    Tower crane climbing frame

    LIU XIAOHUA | European Patent Office | 2020

    Free access