To provide a method for constructing a mound capable of efficiently and accurately performing a finish piling process for resolving the lack of height in an insufficient range where the height of the mound formed in a main process is insufficient with respect to a target height.SOLUTION: In a finish piling process for resolving the lack of height in an insufficient range Q where the height of a mound M formed in a main process is insufficient with respect to a target height D, a set of block groups G consisting of 1 to 3 rows of blocks B arranged side by side in a ship width direction on left and right bottom portions 4A and 4B of a hold 3, respectively, are grouped into sections S each composed of a block group G of 2 or more and 5 or less rows in a ship longitudinal direction. Then, for each section S, an operation of putting the block group G into the water is divided into a first putting operation and a second putting operation.SELECTED DRAWING: Figure 8
【課題】主工程で形成されたマウンドの高さが目標高さに対して不足している不足範囲の高さ不足を解消する仕上げ積み工程を効率的に精度よく行うことができるマウンドの構築方法を提供する。【解決手段】主工程で形成されたマウンドMの高さが目標高さDに対して不足している不足範囲Qの高さ不足を解消する仕上げ積み工程において、船倉3の左右それぞれの底面部4A、4B上で船幅方向に並列する1列~3列のブロックBを一組のブロック群Gとして、船長方向における2列以上5列以下のブロック群Gで構成されたセクションS毎にグループ分けする。そして、それぞれのセクションS毎にブロック群Gの水中への投入作業を第一投入作業と第二投入作業とに分けて行う。【選択図】図8
METHOD FOR CONSTRUCTING MOUND
マウンドの構築方法
2023-07-31
Patent
Electronic Resource
Japanese
Wave Overtopping Over Rubble Mound Breakwaters
British Library Conference Proceedings | 2001
|European Patent Office | 2015
|Symposium on Design of Rubble Mound Breakwaters
TIBKAT | 1980
|Conceptual design of rubble mound breakwaters
TIBKAT | 1993
|