To shorten work time required for mounting work for mounting a panel at a panel mounting position.SOLUTION: A panel conveyance device 10 is lifted by a lifting device, and conveys a plurality of panels. The panel conveyance device 10 includes: a plurality of suspending parts 12a to 12h for suspending each of the plurality of panels; a forward and backward moving mechanism 14 for moving the plurality of suspending parts 12a to 12h in a front and back direction; a second suspending part 13a which is positioned in front of the forward and backward moving mechanism 14 and suspends one of the plurality of panels; and a vertical movement mechanism 15a for moving the second suspending part 13a in a vertical direction.SELECTED DRAWING: Figure 2
【課題】パネルをパネル取付位置に取り付ける取付作業にかかる作業時間を短縮する。【解決手段】パネル搬送装置10は、揚重装置によって吊り上げられて複数のパネルを搬送する。パネル搬送装置10は、前記複数のパネルをそれぞれ吊り下げる複数の吊下部12a~12hと、前記複数の吊下部12a~12hを前後方向に移動させる前後移動機構14と、前記前後移動機構14の前方に位置し、前記複数のパネルのうちの一つを吊り下げる第二の吊下部13aと、前記第二の吊下部13aを上下方向に移動させる上下移動機構15aとを備える。【選択図】図2
PANEL CONVEYANCE DEVICE AND PANEL INSTALLATION METHOD
パネル搬送装置及びパネル設置方法
2023-07-10
Patent
Electronic Resource
Japanese
CONVEYANCE DEVICE AND INSTALLATION METHOD FOR ELECTRIC PANEL
European Patent Office | 2018
|Photovoltaic panel installation equipment and photovoltaic panel installation method
European Patent Office | 2024
|FLOOR PANEL CONVEYANCE METHOD, SUSPENDING METAL FITTING, AND FLOOR PANEL FIXING METHOD
European Patent Office | 2020
|Photovoltaic panel installation device and installation method
European Patent Office | 2025
|