PROBLEM TO BE SOLVED: To shorten a construction period in the case of renewing an elevator control device.SOLUTION: According to a renewal method of an elevator control device, a removal step removes an existing main controller board which has a first communication interface connected to a housing of the elevator control device and controls the elevator by outputting a signal with a prescribed format through the first communication interface from the housing of the control device. In a first mounting step, the housing of the control device is mounted with a main controller unit in which a new main controller board having a physical size smaller than that of the existing main controller board and a different signal format is connected to a substrate for connection conversion having a same physical size as that of the existing main controller board and a conversion function that receives a signal output from the new main controller board and converts it into a signal with a prescribed format.SELECTED DRAWING: Figure 4
【課題】エレベータの制御装置をリニューアルする場合の工期短縮。【解決手段】実施形態のエレベータの制御装置のリニューアル方法において、取り外し工程は、エレベータの制御装置の筐体に対して接続される第1の通信インタフェースを有し、第1の通信インタフェースを介して所定形式の信号を出力してエレベータを制御する既存のメインコントローラ基板を、制御装置の筐体から取り外す。第1の取り付け工程は、既存のメインコントローラ基板と比較して物理的サイズが小さいとともに信号の形式が異なる新規のメインコントローラ基板と、既存のメインコントローラ基板と物理的サイズが同じであるとともに新規のメインコントローラ基板から出力された信号を受け取って所定形式の信号に変換する変換機能を有する接続変換用基板と、が接続されて構成されるメインコントローラユニットを、制御装置の筐体に取り付ける。【選択図】図4
RENEWAL METHOD OF ELEVATOR CONTROL DEVICE AND MAIN CONTROLLER UNIT
エレベータの制御装置のリニューアル方法、メインコントローラユニット
2018-05-17
Patent
Electronic Resource
Japanese
IPC: | B66B Aufzüge , ELEVATORS |
Elevator renewal construction method and elevator control panel
European Patent Office | 2022
|ELEVATOR RENEWAL CONSTRUCTION METHOD AND ELEVATOR CONTROL PANEL
European Patent Office | 2022
|