PROBLEM TO BE SOLVED: To efficiently prepare a change plan of appropriate crew operation information during a train diagram disturbance or the like.SOLUTION: A crew operation management system 100 includes: a storage part 107 for storing a train diagram, operation information formed by including trains and station sections where each crew performs crewing activities, and information of other movement means except the train regulated by the train diagram; and an operation part 103 for executing movement time calculation processing for calculating a movement time for arriving at a prescribed station from a prescribed place in the case that a prescribe crew uses at least any of the train written in the train diagram and the other movement means, and change plan preparation processing for preparing a change plan for operation information in the case that the crew moves by using at least any of the train and the other movement means by using the calculated movement time when the train diagram is changed.SELECTED DRAWING: Figure 1
【課題】ダイヤ乱れ等に際し、適切な乗務員運用情報の変更案を効率的に生成可能とする。【解決手段】乗務員運用管理システム100において、列車ダイヤと、各乗務員の乗務する列車及び駅区間を含んで構成される運用情報と、列車ダイヤで規定する列車以外の他移動手段の情報と、を保持する記憶部107と、所定乗務員が、列車ダイヤに記載の列車および他移動手段の少なくともいずれかを用いた場合に、所定の場所から所定駅に到達するための移動時間を算定する移動時間算出処理と、列車ダイヤの変更時に、列車および他移動手段の少なくともいずれかを用いて乗務員が移動する場合の運用情報の変更案を、算定した移動時間を用いて作成する変更案作成処理を実行する演算部103を備える構成とする。【選択図】図1
CREW OPERATION MANAGEMENT SYSTEM AND CREW OPERATION MANAGEMENT METHOD
乗務員運用管理システムおよび乗務員運用管理方法
2017-09-07
Patent
Electronic Resource
Japanese
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC / G06Q Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke , DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES |