PROBLEM TO BE SOLVED: To provide a pile driving system capable of further improving working efficiency, when driving a pile by using a work ship having a crane and a pile holder barge detachably solidified to a gunwale of this work ship.SOLUTION: In a state of solidifying a pile holder barge 1 to a gunwale of a crane ship 11, image data on a pile holder 2 and its periphery acquired by a pile holder monitoring camera 16, is displayed in real time on a pile holder monitoring monitor in a control room 15 installed in the crane ship 11, and a pile P1 held by the pile holder 2 is driven by using a hammer device 13 suspended by a crane by respectively operating the crane and the pile holder 2 by a crane operation part and a pile holder operation part in the control room 15.SELECTED DRAWING: Figure 5
【課題】クレーンを備えた作業船とこの作業船の船縁に着脱自在に固結されるパイルホルダー台船とを用いて杭を打設する際に、作業効率をより向上させることができる杭打設システムを提供する。【解決手段】パイルホルダー台船1をクレーン船11の船縁に固結した状態にして、パイルホルダー監視カメラ16により取得したパイルホルダー2およびその周辺の画像データを、クレーン船11に設置されているコントロール室15内のパイルホルダー監視モニタにリアルタイムで表示して、その画像データに基づいて、コントロール室15内のクレーン操作部およびパイルホルダー操作部によってそれぞれクレーンとパイルホルダー2を操作して、パイルホルダー2により保持した杭P1をクレーンで吊り下げたハンマー装置13を用いて打設する。【選択図】図5
PILE DRIVING SYSTEM
杭打設システム
2017-06-08
Patent
Electronic Resource
Japanese
PILE DRIVING MACHINE, AND LIFTING METHOD OF PILE DRIVING MACHINE
European Patent Office | 2019
|