Examples provide a build material management station (106). The station comprises: a processing unit which comprises a first conduit (150a, 150b, 152a, 152b) and at least one pump for pumping build material through the first conduit; and at least one external build material storage tank (110, 114a, 114b). The processing unit further comprises at least a first port and a second port (154a, 154b), both ports being located on the exterior of the processing unit such that the external build material storage tank can be connected to the first conduit through the first port and the external build material storage tank can be connected to the first conduit through the second port
Build material management station
2016-06-29
Patent
Electronic Resource
English
Online Contents | 1997
NTIS | 2016
|NTRS | 2016
|Learning to Build a Space Station
Springer Verlag | 2017
|Build permanent pavements at new Aeronautical station
Engineering Index Backfile | 1918
|