Provided are a crane enabling workability to be improved about connecting a guyline for interconnecting a strut and a boom to the boom, and a crane assembly method. A rope tip part of a winch rope (32) is connected to an intermediate member (4) in a state where a boom (24) and a jib (25) have been fallen on the ground. A winch performs a winding motion of winding the winch rope (4), thereby raising a strut (27) and making the intermediate member (4) approach a guyline connection part (51) of the boom to allow a boom connection end part of a second guyline (3) that is connected to the intermediate member (4) to be connected to the guyline connection part (51).
CRANE AND CRANE ASSEMBLY METHOD
KRAN UND KRANMONTAGEVERFAHREN
GRUE ET PROCÉDÉ D'ASSEMBLAGE DE GRUE
2025-04-09
Patent
Electronic Resource
English
IPC: | B66C Krane , CRANES |