The present invention relates to a method for installing or mounting a tower (1) formed by the stacking of two or more mounting groups (2, 2') on a base section (3), wherein at least one of said mounting groups (2, 2') is formed by a plurality of stacked segments (4, 5, 4', 5'). Said method comprises: arranging the base section (3) in the definitive position thereof on the ground; and lifting and placing the mounting groups (2, 2') of the tower (1) on the base section (3) by means of a mounting crane that can adopt different jib configurations. Advantageously, in said method at least two or more stacked segments (4, 5, 4', 5') are installed consecutively in the corresponding mounting group (2, 2') with one and the same crane jib configuration, wherein the length (l4,l4') of the lowest stacked segment (4, 4') of said mounting group (2, 2') is smaller than the length (l5,l5') of at least another stacked segment (5, 5') of the aforementioned mounting group (2, 2').
METHOD FOR INSTALLING A TOWER AND TOWER INSTALLED BY SAID METHOD
VERFAHREN ZUR INSTALLATION EINES TURMS UND MIT DIESEM VERFAHREN INSTALLIERTER TURM
PROCÉDÉ D'INSTALLATION D'UNE TOUR ET TOUR INSTALLÉE AU MOYEN DE CE PROCÉDÉ
2024-08-07
Patent
Electronic Resource
English
Tower crane, climbing frame of tower crane and climbing frame installing method
European Patent Office | 2020
|