The present invention is composed of a steel rope, erect a temporary explosion-proof suspended ropeway bridge, applied to urgently transport personnel, vehicles, or similar heavy equipment over mountain valleys, col, cliffs, and other areas where bridges are required, a temporary ropeway bridge may be quickly erected by the method of the present invention, the method is that, when the personnel and equipment reach the valley side, start with a guide rope path (14), two people carried portable stakes (8) (Patent 112018006104.3) and tools across the valley, after installing the portable stake, personnel from both sides shall cooperate with the erection of steel wire rope ropeway (11), Install the crane pulley (6), it can transport ordinary vehicles or military vehicles, tanks and vehicles, armored vehicles, self-propelled artillery and other equipment through the canyon, the characteristics are that, installation and disassembly simply save time, flexible, concealed, not easy to detect, can adjust the flexibility degree and droop degree at any time, not easy to be hit by other rigid objects or a guided bomb hit it, even if it hits it, can also automatically slide on.
TEMPORARY EXPLOSION-PROOF SUSPENDED ROPEWAY BRIDGE
TEMPORÄRE EXPLOSIONSGESCHÜTZTE HÄNGESEILBAHNBRÜCKE
PONT SUSPENDU TEMPORAIRE DE TÉLÉPHÉRIQUE ANTIDÉFLAGRANT
2024-06-05
Patent
Electronic Resource
English
IPC: | B61B RAILWAY SYSTEMS , Eisenbahnanlagen |
Temporary anti-explosion suspended cableway bridge formed by single steel rope
European Patent Office | 2022
|APPARATUS FOR MOVING ROPEWAY VEHICLES IN A ROPEWAY SYSTEM
European Patent Office | 2020
|