The invention relates to an integrated horizontal preassembling and loading-out system and method for offshore wind turbines. The system comprises: self-propelled modular transporters disposed at a dock, a wind turbine installation vessel and lifting devices, wherein the transporters comprise tower transporters and a nacelle transporter; the tower transporters comprise lower tower transporters, a middle tower transporter and an upper tower transporter; a lower tower, a middle tower, an upper tower and a nacelle of a wind turbine are correspondingly mounted on the three types of transporters; the lower tower transporters, the middle tower transporter, the upper tower transporter and the nacelle transporter move along the same axis to implement butting between sections of the wind turbine; the lifting devices comprise supporting legs vertically mounted on the deck, the supporting legs are axially provided with first rails, the first rails are provided with sliding wind turbine lifters, and the wind turbine lifters are provided with fixing clamps. The system uses the self-propelled modular transporters at the dock to implement butting of sections of a wind turbine and integrated preassembling and loading-out, so that the difficulty and risk associated with the preassembling and loading-out of wind turbines are reduced, the efficiency of preassembling and loading-out can be improved, and the energy consumption can be lowered.


    Access

    Download


    Export, share and cite



    Title :

    OVERALL HORIZONTAL PRELOADING-BOARDING SYSTEM FOR OFFSHORE WIND TURBINE AND PRELOADING-BOARDING METHOD


    Additional title:

    VOLLSTÄNDIG HORIZONTALES VORSPANNUNGSSCHALUNGSSYSTEM FÜR OFFSHORE-WINDTURBINEN UND VORSPANNUNGSSCHALUNGSVERFAHREN
    SYSTÈME D'EMBARQUEMENT-PRÉCHARGEMENT HORIZONTAL HORS TOUT POUR ÉOLIENNE EN MER ET PROCÉDÉ D'EMBARQUEMENT-PRÉCHARGEMENT


    Contributors:
    ZHU LING (author) / CHEN MINGSHENG (author) / ZOU MEIYAN (author) / WANG JIAYUE (author) / DENG XU (author) / DU HUIZI (author) / CHEN TIANXI (author) / YU JINHENG (author)

    Publication date :

    2020-12-23


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    English


    Classification :

    IPC:    F03D Windkraftmaschinen , WIND MOTORS / B60P Fahrzeuge zum Transport von Lasten oder zum Befördern, Tragen oder Aufnehmen besonderer Lasten oder Gegenstände , VEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS / B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS



    BOARDING SYSTEM FOR OFFSHORE PLANT AND BOARDING METHOD USING THE SAME

    KIM DEOK SOO / YOON SANG CHAN | European Patent Office | 2016

    Free access

    Manned boarding device of offshore wind turbine operation auxiliary ship

    YU JIA / MA CHUNLONG / PEI LIQIN et al. | European Patent Office | 2025

    Free access

    WIND TURBINE INSTALLATION VESSEL HAVING PRELOADING WEIGHT KIT

    PARK JOO SHIN | European Patent Office | 2023

    Free access

    BOARDING SUPPORT DEVICE, BOARDING SUPPORT SYSTEM, AND BOARDING SUPPORT METHOD

    AKARI NARIHIRO / NAKAMURA MASAHIDE / MIKURIYA YUTAKA | European Patent Office | 2023

    Free access

    BOARDING DETERMINATION SYSTEM AND BOARDING DETERMINATION METHOD

    KEZUKA TAKAFUMI / KUWANO TOSHIYUKI | European Patent Office | 2021

    Free access