A climbing device for carrying out a movement relative to a tower, to a part-ring segment for a tower, to a tower, to a wind power installation, and to a method for producing a tower. A climbing device for carrying out a movement relative to a tower, comprising a main body having a longitudinal extent from a first end to a second end, wherein the second end in an operating state faces a foundation of a tower; at least one first climbing element having an extent between a first inner end and a first holding end; at least one second climbing element having an extent between a second inner end and a second holding end; wherein the first climbing element is disposed and configured for carrying out a first holding movement of the first holding end relative to the main body, by way of a first holding movement direction that is orthogonal to the longitudinal extent, and/or for carrying out a first climbing movement of the first holding end relative to the main body.


    Access

    Download


    Export, share and cite



    Title :

    STEIGVORRICHTUNG ZUR AUSFÜHRUNG EINER BEWEGUNG RELATIV ZU EINEM TURM UND VERFAHREN ZUR HERSTELLUNG EINES TURMS


    Additional title:

    CLIMBING DEVICE FOR CARRYING OUT A MOVEMENT RELATIVE TO A TOWER AND METHOD FOR PRODUCING A TOWER
    DISPOSITIF DE MONTÉE POUR LA RÉALISATION D'UN MOUVEMENT PAR RAPPORT À UN MÂT ET PROCÉDÉ DE FABRICATION D'UN MÂT


    Contributors:
    KNOOP FRANK (author)

    Publication date :

    2022-11-02


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    German


    Classification :

    IPC:    E04H Gebäude oder ähnliche Bauwerke für besondere Zwecke , BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES / B66C Krane , CRANES / F03D Windkraftmaschinen , WIND MOTORS






    VERFAHREN ZUM ERRICHTEN UND/ODER RÜCKBAUEN EINES TURMS, INSBESONDERE EINES TURMS EINER WINDENERGIEANLAGE

    LAGERWEIJ HENDRIK LAMBERTUS / VAN DE POL AART / PUBANZ ANDRE HEINZ et al. | European Patent Office | 2024

    Free access

    Verfahren zum Errichten eines Turms einer Windenergieanlage

    VAN OHLEN HERMANN / HÖLSCHER NORBERT / HONCZEK MICHAEL et al. | European Patent Office | 2017

    Free access