A method and assembly for operating at least two lifting gears in a group operation, where each lifting gear has a hoist via which a respective cable or chain can be raised or lowered. The hoists are first operated in a synchronous operating mode to perform a common lifting procedure to move a load supported by the hoists. At least one of the hoists involved in the common lifting procedure is then deactivated to switch from the synchronous operation into an individual operation or a multi-operation, with at least one of the hoists remaining activated to carry out a lifting or lowering process relative to each deactivated hoist. A load value is then determined for the at least one deactivated hoist and compared to a predetermined threshold value of the at least one deactivated hoist.


    Access

    Download


    Export, share and cite



    Title :

    VERFAHREN ZUM BETREIBEN VON MINDESTENS ZWEI HEBEZEUGEN IN EINEM GRUPPEN-BETRIEB UND ANORDNUNG MIT MINDESTENS ZWEI HEBEZEUGEN


    Additional title:

    METHOD FOR OPERATING AT LEAST TWO LIFTING DEVICES AS A GROUP, AND ASSEMBLY COMPRISING A LEAST TWO LIFTING DEVICES
    PROCÉDÉ POUR FAIRE FONCTIONNER AU MOINS DEUX APPAREILS DE LEVAGE EN GROUPE, ET ENSEMBLE COMPORTANT AU MOINS DEUX APPAREILS DE LEVAGE


    Contributors:

    Publication date :

    2019-09-04


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    German


    Classification :

    IPC:    B66C Krane , CRANES





    Arbeitsschutz beim Einsatz von Hebezeugen

    Eisner,J. | Automotive engineering | 1976


    ANORDNUNG AUS MINDESTENS ZWEI ELEKTRISCHEN TRAKTIONSENERGIESPEICHERN

    HESSEL MARCEL / KIGIN ERDOGAN / JOHN DENNIS | European Patent Office | 2016

    Free access

    Anordnung aus mindestens zwei elektrischen Traktionsenergiespeichern

    HESSEL MARCEL / KIGIN ERDOGAN / JOHN DENNIS | European Patent Office | 2016

    Free access