A method of transporting a rigid tie-in connection across a body of water for installation underwater is disclosed. The method includes the step of supporting the tie-in connection in the water by buoyancy acting on a frame that supports the tie-in connection until installation. The buoyancy-supported frame is lowered and the tie-in connection into a sub-surface transit configuration. The method further includes in the transit configuration, towing the buoyancy-supported frame and the tie-in connection behind a towing vessel toward an installation site. Also disclosed is a system for implementing the method. The system includes a towable frame arranged to support the tie-in connection until installation and an external buoyancy attached to the frame by an extensible suspension link arranged to suspend the frame from the buoyancy in water in use. The link is extensible to lower the frame from a raised surface-tow configuration into a lowered sub-surface transit configuration.
TRANSPORTATION AND INSTALLATION OF SUBSEA RIGID TIE-IN CONNECTIONS
TRANSPORT UND INSTALLATION VON STARREN UNTERWASSERKOPPLUNGSVERBINDUNGEN
TRANSPORT ET INSTALLATION DE CONNEXIONS DE RACCORDEMENT RIGIDE SOUS-MARIN
2019-07-24
Patent
Electronic Resource
English
IPC: | F16L PIPES , Rohre / B63C LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS , Zuwasserlassen, Trockenstellen, Docken oder Bergen von Schiffen / B63G OFFENSIVE OR DEFENSIVE ARRANGEMENTS ON VESSELS , Angriffs- oder Verteidigungsanordnungen auf Schiffen / E21B EARTH OR ROCK DRILLING , Erd- oder Gesteinsbohren |
Transportation and installation of subsea rigid tie-in connections
European Patent Office | 2018
|Transportation and Installation of Subsea Rigid Tie-In Connections
European Patent Office | 2016
|Transportation and installation of heavy subsea structures
European Patent Office | 2017
|Transportation and Installation of Elongate Subsea Elements
European Patent Office | 2017
|Transportation and installation of elongate subsea elements
European Patent Office | 2018
|