The present charging rate of a battery (12) is accurately calculated. The calculation mode of the present charging rate is switched to a current integration mode during operation of a generator motor (8) while the mode is switched to a voltage reference mode at a predetermined switchover timing. In the current integration mode, charge current of the battery is integrated and added to the initial charging rate and an integrated discharge current value is subtracted from the initial charging rate of the battery to calculate the present charging rate. In the voltage reference mode, the present charging rate is calculated based on a predetermined map and detected voltage of the battery. After calculation of the present charging rate according to the voltage reference mode, the calculation mode is restored from the voltage reference mode to the current integration mode and the suspension of operating the generator motor is cancelled.
Battery controller for a hybrid construction machine
Batteriesteuerung für eine Hybride Baumaschine
Appareil de controle pour la batterie d'une machine de construction hybride
2018-11-21
Patent
Electronic Resource
English
IPC: | E02F Baggern , DREDGING / B60L PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES , Antrieb von elektrisch angetriebenen Fahrzeugen / G01R Messen elektrischer Größen , MEASURING ELECTRIC VARIABLES / G06F ELECTRIC DIGITAL DATA PROCESSING , Elektrische digitale Datenverarbeitung / H01M Verfahren oder Mittel, z.B. Batterien, für die direkte Umwandlung von chemischer in elektrische Energie , PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY / H02J CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER , Schaltungsanordnungen oder Systeme für die Abgabe oder Verteilung elektrischer Leistung |