The invention discloses a high holding power anchor group system and a mounting method.The high holding power anchor group system comprises a front high holding power anchor and a rear high holding power anchor, the front high holding power anchor comprises a front high holding power anchor plate, a front high holding power anchor shin is fixed to the top face of the front high holding power anchor plate, and a rear high holding power anchor shin is fixed to the top face of the rear high holding power anchor plate; a front mooring point is formed at the front end of the front high holding power anchor shank, the front mooring point is connected with one end of the mooring anchor chain, the rear high holding power anchor comprises a rear high holding power anchor plate, a rear high holding power anchor shank is fixed to the top face of the rear high holding power anchor plate, a rear mooring point is formed at the front end of the rear high holding power anchor shank, and the rear mooring point is connected with one end of the mooring anchor chain. And the connecting piece at the rear end of the anchor plate of the front high holding power anchor is connected with the rear mooring point through a connecting anchor chain. The high holding power anchor group system can be embedded into soft seabed soil by a deeper depth, so that the bearing capacity is improved.
本发明公开了一种大抓力锚组系统及安装方法,一种大抓力锚组系统包括前部大抓力锚和后部大抓力锚,所述前部大抓力锚包括前部大抓力锚锚板,所述前部大抓力锚锚板的顶面上固定有前部大抓力锚锚胫,所述前部大抓力锚锚胫的前端形成前系泊点,所述前系泊点与系泊锚链的一端连接,所述后部大抓力锚包括后部大抓力锚锚板,所述后部大抓力锚锚板的顶面上固定有后部大抓力锚锚胫,所述后部大抓力锚锚胫的前端形成后系泊点,所述前部大抓力锚锚板后端的连接件与后系泊点之间通过连接锚链进行连接。该大抓力锚组系统能在软质海床土中嵌入更深的深度,以提高承载力。
High holding power anchor group system and mounting method
一种大抓力锚组系统及安装方法
2025-05-13
Patent
Electronic Resource
Chinese
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |