The suction tube temporary pile shoe structurally comprises a top platform, a groove is formed in the center of the top platform, four lifting lugs are evenly distributed on the top of the top platform in the circumferential direction, and a gravel layer is laid in the groove of the top platform; a suction cylinder group is arranged at the bottom of the top platform, and N pump skid bodies are movably arranged on the gravel layer of the top platform and are respectively matched with four suction cylinders in the suction cylinder group so as to drive the four suction cylinders to sink to a parking state or float upwards to be in a movable state; the structure meets the parking requirement of the platform ship and can be selectively moved to a designated machine position along with the workboat, and repeated parking is achieved. Compared with an existing platform ship parking mode, according to the two wind power operation methods correspondingly achieved through the structure, pile legs of the platform ship do not need to be inserted into mud any more, the requirement for a platform ship lifting system is lowered, the problem that the construction efficiency is low due to pile washing and ballast water adjusting is solved, and the offshore wind power construction efficiency and quality are improved.
本发明公开了一种用于深远海风电的吸力筒临时桩靴及其风电作业施工方法,结构包括中心设有凹槽的顶部平台,其顶部沿周向均布设置有四个吊耳,其凹槽内铺设有碎石层;顶部平台底部设有吸力筒组,在顶部平台的碎石层上还活动设置有N个泵撬体,其分别与吸力筒组中的四个吸力筒相配合,以驱动四个吸力筒下沉至驻位状态、或上浮呈可移动状态;该结构满足平台船的驻位需要,并能可选择性地随作业船移位至指定机位,实现反复驻位;与现有平台船驻位方式相比,采用该结构对应实现的两种风电作业方法不再需要将平台船的桩腿插入泥中,降低对平台船升降系统要求,避免冲桩和调整压载水导致的施工效率低下问题,提升海上风电建设效率和质量。
Suction barrel temporary pile shoe for deep and far sea wind power and wind power operation construction method of suction barrel temporary pile shoe
一种用于深远海风电的吸力筒临时桩靴及其风电作业施工方法
2025-03-18
Patent
Electronic Resource
Chinese
Segmented construction method for pile shoe of wind power installation vessel
European Patent Office | 2025