The invention relates to the field of hoisting platforms, and discloses a multifunctional hoisting platform for wind power tower foundation installation, the multifunctional hoisting platform comprises a base, a crane assembly is arranged at the top end of the base and is used for bearing, lifting and rotating a lifting hook assembly, and four buckle assemblies are arranged in the lifting hook assembly and are used for fixing and limiting four fixing seats; and a telescopic assembly is arranged in the lifting hook assembly and used for stretching out and drawing back the protection assembly, the lifting hook assembly comprises a mounting base, mounting frames are fixedly connected to the left side and the right side of the bottom end of the mounting base, binding bands are arranged at the bottom ends of the mounting frames, and a fixing frame is fixedly connected to the upper side of the mounting base. The lifting hook assembly can meet the lifting requirements of different parts, and the multifunctional effect is achieved, so that accessories do not need to be frequently replaced, time can be greatly saved for operators, the equipment adjustment and waiting time is shortened, the continuity of the lifting process is ensured, and the construction progress is remarkably accelerated.
本发明涉及吊装平台领域,公开了风电塔架基础安装的多功能吊装平台,包括底座,所述底座的顶端设置有起重机组件,其用于对吊钩组件进行承重、升高和转动,所述吊钩组件的内部设置有四个卡扣组件,其用于对四个固定座进行固定限位,所述吊钩组件的内部设置有伸缩组件,其用于对防护组件进行伸缩,所述吊钩组件包括安装座,所述安装座的底端左右两侧均固定连接有安装架,所述安装架的底端设置有绑带,所述安装座的上侧固定连接有固定架。通过吊钩组件能够适应不同部件的吊装需求,实现多功能效果,从而不需要频繁更换配件,操作人员可以大大节省时间,减少了设备调整和等待时间,确保了吊装过程的连续性,显著加快了施工进度。
Multifunctional hoisting platform for wind power tower foundation installation
风电塔架基础安装的多功能吊装平台
2025-03-07
Patent
Electronic Resource
Chinese
European Patent Office | 2025
|Hoisting equipment for electric power iron tower installation
European Patent Office | 2024
|