The invention relates to an integrated deck tank and a ship. The integrated deck tank comprises a tank body, a pipeline module and a maintenance module. The pipeline module comprises a pipeline and a plurality of first supporting units used for fixing the pipeline, the first supporting units are fixedly arranged on the upper side of the tank body, and the pipeline is arranged on the first supporting units; the overhauling module comprises an overhauling platform and a plurality of second supporting units, the second supporting units are fixedly arranged on the upper side of the tank body, the overhauling platform is fixedly connected to the upper sides of the second supporting units, the second supporting units are perpendicular to the first direction of the tank body, and the first direction is perpendicular to the central axis of the tank body; the bottom of the tank body is fixedly connected with at least one tank body supporting piece. According to the scheme provided by the invention, the influence on the deck due to repeated cutting of the supporting legs when the tank body is mounted on the ship can be reduced, the dock building period can be shortened, and the building efficiency can be improved.
本申请涉及一种一体化甲板罐及船舶,包括:罐体、管道模块、检修模块;管道模块包括管道和若干个用于固定管道的第一支撑单元,第一支撑单元固定设置于罐体上侧,管道设置于第一支撑单元上;检修模块包括检修平台和若干个第二支撑单元,第二支撑单元固定设置于罐体上侧,检修平台固定连接于第二支撑单元上侧,第二支撑单元与罐体的第一方向垂直,第一方向垂直于罐体的中轴线;罐体底部固定连接有至少一个罐体支撑件。本申请提供的方案,能够减少罐体安装在船舶上时多次修割支撑脚,对甲板造成影响,且可以缩短船坞建造周期,提高建造效率。
Integrated deck tank and ship
一种一体化甲板罐及船舶
2025-03-04
Patent
Electronic Resource
Chinese
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |
DECK-PLACED TANK STRUCTURE, SHIP, TANK INSTALLATION METHOD, AND INSPECTION METHOD
European Patent Office | 2019
|TANK STRUCTURE PLACED ON DECK, SHIP, INSTALLATION METHOD OF TANK AND INSPECTION METHOD
European Patent Office | 2019
|