The invention relates to a pile driving barge pile frame closure gap rail section manufacturing method. The pile frame is constructed by taking a closure gap track as a benchmark, and a closure gap track mounting procedure is moved forwards, and comprises the following steps: dividing a closure gap into a plurality of sections for respective construction; when the segmented stand columns are spliced, the closure gap segments are synchronously installed; panels of the closure gap sections are positioned and installed, and the closure gap panels are fixed through U-shaped clamping plates; mounting a lifting platform rail; the cross beam is installed, then the oblique beam is installed, and the oblique beam is in butt joint with the front limb tube and the front supporting foot base structure. The method has the advantages that the closure gap is divided into a plurality of sections, and the closure gap structure is constructed in sections, so that the closure gap precision is ensured; the pile driving barge pile frame is constructed with the closure gap track as the reference, the closure gap installation procedure is moved forwards, and the construction precision and quality of the closure gap track are guaranteed; the ship and the pile frame are simultaneously built and installed in the dock and simultaneously launched, so that the efficiency is improved, and the planned progress is ensured.

    本发明涉及打桩船桩架龙口轨道分段制作方法。桩架建造时以龙口轨道为基准进行建造,将龙口轨道安装工序前移,包括以下步骤:将龙口划分成若干分段分别建造;分段立柱拼装时,同步安装龙口分段;龙口分段的面板定位安装,龙口面板使用U型卡板固定;升降平台轨道安装;将横梁安装再进行斜梁的安装,斜梁与前肢管以及前支脚底座结构对接。本发明的优点在于:通过将龙口划分成若干分段,分段建造龙口结构,确保龙口精度;打桩船桩架建造时以龙口轨道为基准进行建造,将龙口安装工序前移,保证龙口轨道的建造精度和质量;船舶和桩架在船坞内同时建造安装,同时下水,提升效率,保证计划进度。


    Access

    Download


    Export, share and cite



    Title :

    Method for manufacturing pile driving barge pile frame closure gap track sections


    Additional title:

    打桩船桩架龙口轨道分段制作方法


    Contributors:
    ZHANG JIN (author) / LI JIE (author) / SONG YUFU (author) / YANG YONGKUN (author) / LU JUN (author) / TAN JINBAO (author) / XU DANDAN (author) / LU JIAN (author)

    Publication date :

    2025-02-28


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    E02D FOUNDATIONS , Gründungen / B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS



    Pile driving barge pile frame system and control method

    ZHANG QINGSHENG / WANG TAO / HANG AIQUN et al. | European Patent Office | 2024

    Free access

    Manufacturing and mounting process of pile frame of pile driving barge

    ZHU JINGJIA / LUO CAISHENG / JIANG FENGSHENG et al. | European Patent Office | 2015

    Free access

    Pile driving barge pile frame pile reversing mechanism and working method thereof

    DAI XUELIANG / GAO ZHUOPENG / ZOU XUEYI et al. | European Patent Office | 2024

    Free access

    Pile frame jacking device of pile driving barge, and pile frame jacking and lying method

    YU GUOBIN / YU HUI / ZHANG TIE et al. | European Patent Office | 2020

    Free access

    Manufacturing method of buoyancy tank of pile driving barge, buoyancy tank and pile driving barge

    LI ZHENYU / YE PEIGEN / YANG HONGDANG et al. | European Patent Office | 2024

    Free access