The invention relates to a pile driving barge pile overhead middle folding process. The pile frame is divided into the first-section pile frame and the second-section pile frame according to the weight, the two sections are hoisted on the ship to be closed and butted in the air, the wharf pile frame can be debugged after the ship enters the water, floating crane hoisting and cost dispatching are omitted, and the method is more economical and environmentally friendly; the problems that a common dock cannot be integrally hoisted, and an ultra-large pile frame is difficult to install in the dock are solved.
本发明涉及一种打桩船桩架空中合拢工艺。本发明中将桩架按重量分为第一段桩架和第二段桩架2个部分,并将两段吊运在船上进行空中合拢对接,船舶下水之后即可进行码头桩架调试,省去了浮吊吊运以及调遣费用,更经济环保,解决了一般的船坞无法整体吊装、超大型桩架坞内安装难的问题。
Pile driving barge pile overhead middle folding process
一种打桩船桩架空中合拢工艺
2025-01-07
Patent
Electronic Resource
Chinese
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |
Intertidal zone pile driving barge and moving method of pile driving barge
European Patent Office | 2023
|European Patent Office | 2023
|