The invention relates to the field of dock gate preparation, in particular to a construction method for underwater turnover of a dock gate, a dock gate structure located at a delivery point is included, a connecting part is arranged on one side of the dock gate structure, the connecting part comprises a first connecting part and a second connecting part, and the construction method comprises the following steps that S1, the dock gate structure is transported to a destination from the delivery point in a floating mode; s2, then a lifting device is erected, and the lifting device is connected with the first connecting part and the second connecting part; s3, the second connecting part is lifted so that the dock gate structure can be turned over, and the first connecting part and the second connecting part are synchronously tensioned by the lifting device; and S4, underwater turnover of the dock gate structure is completed.
本发明涉及坞门制备领域,具体涉及一种坞门水下翻身的施工方法,包括位于寄放点的坞门结构,所述坞门结构一侧设有连接部,所述连接部包括第一连接部与第二连接部,施工方法如下,S1、将所述坞门结构从寄放点浮运至目的地;S2、随后架设起重装置,所述起重装置分别与所述第一连接部以及所述第二连接部连接;S3、起吊所述第二连接部,以使所述坞门结构翻转,所述起重装置同步拉紧所述第一连接部与所述第二连接部;S4、完成所述坞门结构水下翻身。
Construction method for underwater turnover of dock gate
一种坞门水下翻身的施工方法
2024-12-27
Patent
Electronic Resource
Chinese
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |